VERIFICATION
This process serves to control the precision and tolerances of the productive process. The strategy of auto control and quality follow-up at all the stages of the project in Mycesa ensure the final quality.
Mycesa has the experience to receive and attend to external certifying organisms to validate projects.

Length (mm) | Width (mm) | Height (mm) | |
---|---|---|---|
Verification | 3000 | 1600 | 1800 |
Slide the table to see it completely
Productive capacity
RUSEFUL STROKE DISTANCE: 3000 x 1600 x 1800 |
DEAC NUMERIC CONTROLLER TO MONITOR THE 3 MOTORISED AXIS |
IRON CAST WORKTABLE |
MOTORISED INDEXED HEADSTOCK TESASTAR M |
5WAY ELECTRIC SENSOR RENISHAW TP20 |
CALIBRATION SPHERE |